Thursday 31 March 2011

Production Meeting 3

Production Meeting 3
Unit 4 Drama
25/3/11

Production Management

· Budget will have to remain as an even split until all departments and agreed of a final costing before we can share it out
·        We do not have a portable silks frameit was hired.
·        I have emailed Neil regarding silk time in the theatre, he’s happy to do it but Jo Loader will have to agree a time and date? Potential dates are 20th ,21st, 22nd April
·        Waiting to hear back from the brain observatoryHave heard back, we can use their videos just need to record the show and send them a copy of the show.
·        CBS news video – need to find out about the rights.
·        Is it possible to have a Q&A after the one of the afternoon shows?
·        Running times – maximum of 1 hour 15 mins.
·        Get in starts on the 26th

Stage Management

·    Have you attended rehearsals?Alicia (DSM) has attended rehearsals.
·    Anything to feedback from rehearsals?Worked off the students script from now on will be the directors script.
·    How’s search for props going?Very well, the hospital props are perfect. 3 stethoscopes needed. 
·    Has the ground plan gone down into rehearsals?Yes, as much as possible .
·    When do you think you will be able to complete the props list (date)
·    Have you compiled a list with props / set re; who’s getting what?Yes, Polly is going to take pictures of everything and make up a full props list.
·    Stage management need a rehearsal schedule.
·    The design for the bar is going well, the raised part will be made into a mine theatre, there will be a guest book and a way record comments (maybe in the Q&A?)
·    In the gift bags we could have comment cards/business cards with the blog on them.
·    Do we have a lectern? Maybe in the lecture room.

Lighting– Mike not present for meeting

·    Do you have any question for the directors?Any specific things? Just the silks.
·    Dates for& final design?Waiting for Mike.
·    Have you attended rehearsals?Yes – Spencer has.
·    Have you had a look at the ground plan?Yes – Spencer has.
·    Going to sit down with the set designer and go over the model box.
·    Projection? Maybe use the screens or televisions.
·    MEETING NEXT MONDAYLUNCHTIME ABOUT FLYING WITH PM/SET/LIGHTING/JO LOADER…











Sound

·    What was the outcome with your meeting with Vanessa?
·    Dates for final design ?
·    Are you able to attend rehearsals?
·    Have you researched the music discussed last meeting?
·    Have you had a look at the ground plan?
·    Will have a sound meeting with the director after this production meeting or tomorrow morning.
·    Zach is coming in the recording equipment tomorrow morning to record some performers. (10am).
·    Has an initial design, if anybody would like a copy please let Zach know. 




Set

·    Could we have the design in a4 please?Not needed anymore
·    How are the designs coming along?All the hung flats are built, window, screens, wallpaper, table, lecture table and sink unit basically done, just finishes need doing.
·    Are you flying anything?
·    Need to arrange a walk through with the director and performers, maybe tomorrow during ‘Swan’ morning.


Props

·    Could we have a date for when the props will be ready?
·    Will you be making or sourcing rehearsal props?


Costumes

·      Could we have a date for when the costumes will be ready?Trousers and lab coats ready for next Wednesday other costumes will be ready for production week.
·      Costumes are coming along well, all measurements have been taken.
·      Trouser fittings Friday if possible, performers have a schedule – it should take 15 mins per performer, two at a time.









AOB

·      Publicity – Spencer has sketched an initial design for the poster
·      Devon, Becca and Spencer will meet and liaise about the publicity 







Next Meeting 6th April 13:30 Production Room






Production Manager: Josh Attwood 07917654611
Assistant Production Manager: Ruby Cooper